Select any case to open the full story below

Business
Rockneby, Sweden
Kalmar EV charger
EV fast charging · Solar storage
436 kWh installed

Business
Odense, Denmark
Odense (N-Tech)
Grid services · Self-consumption
1,044 kWh installed

Business
Stenløse, Denmark
Stenløse Holger
Standalone battery storage
215 kWh installed
Business
·
Sweden
Kalmar EV charger
EV charging
Rockneby, Sweden
Installed · August 2026


436 kWh
Battery capacity
360 kW
Combined DC charging
63 A
Grid connection
Battery storage, solar energy and high-power EV charging enable a local business to offer fast charging with only a 63 A grid connection. Two ZOE DC fast chargers deliver up to 180 kW each, supported by integrated battery storage. The batteries store local solar production and supply extra power when demand exceeds grid capacity, enabling fast charging without a major grid upgrade and creating a new revenue opportunity.
Installation details
Installed solution
2 × Z BOX EV with integrated ZOE DC fast chargers
Per charger
180 kW charging power / 218 kWh battery storage
Application
Battery-supported fast charging, solar storage and dynamic power management
Delivery
Energy management, installation and commissioning by Emaldo
