Real projects. Real results.

Real projects. Real results.

From critical infrastructure to EV charging: see how Emaldo systems perform in the field. Select a case to read the full story.

From critical infrastructure to EV charging:
see how Emaldo systems perform in the field. Select a case to read the full story.

Select any case to open the full story below

ZOE DC fast charger in Kalmar with a driver charging an EV

Business

Rockneby, Sweden

Kalmar EV charger

EV fast charging · Solar storage

436 kWh installed

Aerial view of the N-Tech site in Odense with four Z-BOX-C-Plus units

Business

Odense, Denmark

Odense (N-Tech)

Grid services · Self-consumption

1,044 kWh installed

Freestanding Z-BOX-C battery in a forest near Stenløse

Business

Stenløse, Denmark

Stenløse Holger

Standalone battery storage

215 kWh installed

Customer case

·

Business

·

Sweden

Kalmar EV charger

EV charging

Rockneby, Sweden

Installed · August 2026

ZOE DC fast charger in Kalmar with a driver charging an EV
Kalmar EV charging

436 kWh

Battery capacity

360 kW

Combined DC charging

63 A

Grid connection

Battery storage, solar energy and high-power EV charging enable a local business to offer fast charging with only a 63 A grid connection. Two ZOE DC fast chargers deliver up to 180 kW each, supported by integrated battery storage. The batteries store local solar production and supply extra power when demand exceeds grid capacity, enabling fast charging without a major grid upgrade and creating a new revenue opportunity.

Installation details

Installed solution

2 × Z BOX EV with integrated ZOE DC fast chargers

Per charger

180 kW charging power / 218 kWh battery storage

Application

Battery-supported fast charging, solar storage and dynamic power management

Delivery

Energy management, installation and commissioning by Emaldo