English

EMALDO BUSINESS 360° · BATTERY STORAGE FOR BUSINESSES

EMALDO BUSINESS 360° · BATTERY STORAGE FOR BUSINESSES

Your complete battery solution.

You focus on your business. We handle your energy solution.

You focus on your business. We handle your energy solution.

THE ALL-IN-ONE PACKAGE

Business 360°

One partner. One solution.

Every step covered.

Emaldo One Business

Advice, hardware, installation, value generation and aftercare.

Grid connection

INCLUDED

We manage the technical application and coordination with the grid operator.

Emaldo Protect

Ongoing monitoring, maintenance and support.

*Available for businesses in Denmark

ACCOUNT MANAGER · DENMARK

Per Nybo

Starts with your consumption, grid connection and energy bill. Your dedicated contact all the way.

Business case

C&I SPECIALIST · DENMARK

Peter Harwith

Has done grid applications by hand and knows where they get stuck.

Grid connection

SOUND FAMILIAR?

A battery makes sense.
But where do you start?

Here is what happens, step by step, and what you need to do.
Spoiler: very little.

1

SAVINGS CALCULATOR

See what a battery could save your business.

Upload your company’s energy data and get a first estimate based on your own energy profile. It takes 6 clicks.

✓

Based on your actual consumption, not an industry average

✓

A first business case in a few minutes

✓

Go through the result with Per or Peter

emaldo

Step 1 of 3

ESTIMATE YOUR SAVINGS

Tell us about your site.

How much you use and when you use it. Together they give us the load profile we price battery and charging against.

Postcode

2830

Four digits — we work out your price area from it.

Denmark and Sweden only · all figures in SEK/DKK

Annual electricity use

1 080 000

kWh

It is on any monthly invoice, by your meter number.

I don’t know it

SV

DK

EN

2

ADVICE & DESIGN

“Which system is right for us?”

Reach out. We take it from there.

We look at your consumption, site and goals, and build the business case with you. All you need to do is get in touch.
From here, Emaldo takes over. You can sit back and relax.

We review your consumption, site and goals, then build the right business case with you.

Talk to Per or Peter →

YOU

Book a call with Per or Peter

EMALDO

✓

Analyse your consumption and load profile

✓

Check your site and grid connection

✓

Design the right system

✓

Build the business case with you

3

GRID CONNECTION

“What does the grid operator need?”

The grid operator? We’ve got it.

Leave the hours of paperwork to us. Before your battery can be connected, the grid operator has to approve it, and the application is long and technical. We prepare it, get the installer’s sign-off and follow up until it is approved.

10 hours

an application can take by hand

0 hours

spent by you.

We handle the rest

Grid connection application

Handled by Emaldo

✓

Site and system data collected

✓

Installer found

✓

Application prepared and signed by the installer

Submitted · we follow up for you

Approved · ready to start saving

4

INSTALLATION

“Who will install it?”

Installed by people we trust.

We match you with one of our recommended installation partners and coordinate the work until the battery is up and running.

✓

Installation partner matched

✓

Work coordinated by Emaldo

5

PROTECTION

“Who looks after it afterwards?”

After installation, we’re still here.

After installation, we’re still here.

Ongoing monitoring, maintenance and support, so the battery keeps performing year after year.

Emaldo Protect

System running normally

Monitoring

Monitoring and service

Active

Handled by Emaldo

Next service

Handled by Emaldo

Your contact

Per & Peter

One partner. One solution. Every step covered.

EXAMPLE

You own a wind turbine and want to store the power in a battery.

You have one conversation with us. We handle the rest.

You have one conversation with us. We handle the rest.

CUSTOMER CASE

Odense (N-Tech)

At Gartneriet Rostgaard, four Emaldo Z-BOX-C-Plus units combine grid-service revenue with on-site solar optimisation.

Location

Odense, Denmark

Industry

Battery storage & grid services

System

4 × Z-BOX-C-Plus

Installed

September 2026

Battery capacity

1,044 kWh

Listed power output

420 kW*

“I didn’t have to adjust anything. It all runs by itself.”

Per Bystrup

Gartneriet Rostgaard

EMALDO BUSINESS 360°

One partner. One solution. Every step covered.

One partner. One solution. Every step covered.

One partner. One solution. Every step covered.

Tell us briefly about your business, and Per or Peter will call you back. It is free and without obligation.

Per and Peter

We only use your details to contact you about your enquiry. Privacy policy

Got questions?

Frequently asked.

Frequently asked.

Frequently asked.

Find answers to the most frequently asked questions about Business 360°.

Find answers to the most frequently asked questions about Business 360°.

Three parts in one package: Emaldo One Business (advice, hardware, installation, value generation and aftercare), grid connection (the technical application and coordination with the grid operator) and Emaldo Protect (ongoing monitoring, maintenance and support).
Yes. A battery must be approved by the grid operator before it can be connected to the grid. With Business 360°, we prepare the application for you, and the installer approves it with a single link.
It depends on your consumption, your grid connection and the size of the system. Use the savings calculator for a first estimate based on your own energy data, or book a free consultation and Per or Peter will go through the numbers with you.
It depends mainly on the grid operator’s approval and on the work needed at your site. We handle the grid application for you, and at the free consultation we give you a realistic timeline for your project.
Talk to us about it. An authorised installer needs to approve the grid application, and we will find the right set-up for your site, with your installer or one of ours.

Didn’t find the answer you were looking for?

Talk to a specialist

© 2025 Emaldo ApS. All rights reserved.

Designed in Denmark